中文字幕日韩在线观看,久久久人人玩人妻精品综合,国产欧美日本在线,久久精品免费视频6,欧美精品黄色网站,色综合久久久久无码专区,亚洲区欧美中文字幕久久,国产手机在线视频,国产中文字幕视频在线观看,日本一区二区免费在线观看

Hotline:400-880-1556

English




Electric toys apply for CCC certification

Author:中認(rèn)聯(lián)科 time:2020-06-28 Ctr:1595

CCC certification materials are roughly divided into three parts, the first application materials, the second part is the sample testing materials, and the third is the factory audit materials.

It is divided into initial application and reapplication, as follows:

Documents to be provided in the initial application or related information change

Application for mandatory product certification;

Copy of the applicant's "Business License of Enterprise Legal Person" or registration certificate (provided at the time of the initial application or change);

Organization chart of the production plant (provided at the time of initial application or change);

Process flow chart for applying for certification products (provided at the time of initial application or change);

A list of key instruments and equipment for routine inspections (see the requirements for factory quality control testing of certification implementation rules) (provided at the time of initial application or change);

Product assembly drawing, gas schematic diagram;

Chinese nameplate and warning mark (in duplicate) of the product applying for certification;

Apply for the Chinese manual of the certified product;

Explanation of the differences between products of the same application yuan;

Appearance photos of each model in the same application unit (in duplicate);

Other relevant information required when required (please provide if there is a CB test report).

Documents and materials to be provided when reapplying for similar products

1. Application for mandatory product certification;

2. Product assembly drawing, electrical schematic diagram;

3. Chinese nameplate and warning mark of application for certification products (in duplicate);

4. Apply for the Chinese manual of the certified product;

5. Explanation of differences between products of the same application unit;

6. Appearance photos of each model in the same application unit (in duplicate);

7. Other relevant information requested when needed (please provide if there is CB test report).

List of documents provided by 3C compulsory certification product testing

The following information should be provided when sending samples for product testing:

Sample Registration Form

CCC application details:

Product Manual;

Product specifications;

Product maintenance manual;

Product circuit diagram (including schematic diagram and printed circuit layout);

Explanation of the difference between the main delivery model product and the covered model product in the same application unit;.

A list of key components of the product related to safety and a list of main components that have an impact on electromagnetic compatibility performance;

Copy of product key safety element certification certificate;

Product CB test certificate and report (if any);

The product's trademark use authorization, the material is not the same according to the sample.

Audit materials:

iso documents, purchase orders, testing and certification, including the entire production process and product materials.

CCC certification factory inspection and other matters needing attention

Review content: factory quality assurance capability + product consistency check

1. Factory quality assurance capability review, according to CQC "factory quality assurance capability requirements" and "factory inspection record form".

2. Product consistency check, consistency check of the products certified by the application form, focusing on verifying the following:

(1) The identity (nameplate) of the certified product is consistent with that indicated in the type test report

(2) The consistency of the structure of the certified product and the type test product

(3) Consistency of important parts/components of certified products with "List of important parts/components" in the type test report

(4) Perform on-site inspections in accordance with the "Routine Inspection Items and Confirmation Inspection Items Table"

3. Initial factory inspection method; the initial factory inspection can be carried out separately or combined with the initial inspection or supervision inspection of CCC certification.

Time for initial factory inspection:

Generally, the initial factory inspection is conducted after the type test is passed. Type testing and factory inspection can be carried out at the same time as required. The factory inspection time is determined according to the number of units of the product to be certified, and the specific inspection time is given in the "Special Requirements for Product Certification Implementation Rules" of the corresponding product. The time of the auditors on the road is calculated according to half a working day every day, which is not within the number of people/days listed above.

image.png


Related Articles
  • Want to export to Australia? RCM certification is a must-have admission ticket!

  • Live streaming Camera KC Certification: A stepping Stone to Compliance and a booster for Development

  • CE Certification for Drones: The "Pass" to the European Market

  • Information Express | EU POPs Adds New UV-328 Restriction Requirements; Companies Need to Prepare for Compliance!

Follow Us
国产精品一区二区 尿失禁| 久草视频手机在线观看| 久久久99精品免费观看| r级无码视频在线观看| 波多野结衣绝顶大高潮| 末成年女a∨片一区二区| 久久丫精品国产亚洲av不卡| 日韩人妻精品一区二区三区视频| 亚洲av综合avav中文| 国产精品久久久久久久久久久不卡| 国产精品天天看特色大片| 久久久久久久亚洲AV无码| 亚洲久本草在线中文字幕| 亚洲国产精久久久久久久| 日韩欧美一级| 香蕉久久av一区二区三区| 国产尤物精品视频| 欧美黑人又粗又大高潮喷水| 香蕉人人超人人超碰超国产| 久久国产精品无码网站| 色婷婷亚洲一区二区三区| 亚洲av无码成人精品区| 国产免费av片在线观看| 《熟妇的荡欲》无删减| 国产精品久久午夜夜伦鲁鲁| 国产精品久久二区二区| 韩国v欧美v亚洲v日本v| 国产成人啪精品视频免费软件 | 影音先锋啪啪av资源网站| 东京热一区二区三区无码视频| 国产成人影院在线观看| 久久精亚洲AV品国产| 超碰97人人做人人爱网站| 视频一区二区在线观看| 熟妇人妻中文AV无码| 亚洲理论电影在线观看| 亚洲AV日韩AV香蕉草莓| 国产综合图区| 9191在线视频| 粗壮挺进人妻水蜜桃成熟漫画| 国产成人免费视频|