中文字幕日韩在线观看,久久久人人玩人妻精品综合,国产欧美日本在线,久久精品免费视频6,欧美精品黄色网站,色综合久久久久无码专区,亚洲区欧美中文字幕久久,国产手机在线视频,国产中文字幕视频在线观看,日本一区二区免费在线观看

Hotline:400-880-1556

English




Handling of quality inspection report of adapter plug——ZRLK

Author:中認聯(lián)科 time:2023-05-31 Ctr:819

The conversion socket is a kind of conversion socket which integrates various plugs and jacks. The power plugs of different countries or one country can be converted into power plugs of another country or many countries, so that the electrical appliances of different countries in the world can be used normally in another country. However, in general, if such products want to be put on the domestic e-commerce platform, they need to apply for quality inspection reports.

What is a quality inspection report?

The so-called quality inspection report refers to the safety and performance testing of products, which smoothly entered other platforms such as Tmall and JD.COM Mall or supermarket, or was a reference standard for consumers. According to the three-level standards (national standards, ministerial standards and enterprise's own standards), make quality evaluation, make basic evaluation, and analyze the reasons for qualified or unqualified quality. This is the main part of the quality inspection report. The quality inspection report issued by a laboratory authorized by China Metrology Certification (CMA) and China National Accreditation Committee for Conformity Assessment (CNAS) is valid.

image.png

Detection standard of conversion plug

GB/T 2099.1, IEC 60884-1 Plugs and sockets for household and similar purposes Part 1: General requirements

GB/T 2099.3, IEC 60884-2-5 Plugs and sockets for household and similar purposes Part 2-5: Particular requirements for converters.

The standard specifies the rating, sign, electric shock protection, structure, electrical performance, mechanical performance and other technical requirements of the conversion plug, which is suitable for alternating current, conversion plugs with and without protective doors, fuses and fuses.

Change-over plug detection project

1. Inspection of marks and dimensions;

2. Electric shock protection and grounding measures;

3, the structure of the terminal and end, fixed socket;

4. Structure of plug and movable socket and interlocking socket;

5, aging resistance, protection provided by the shell and moisture-proof;

6, insulation resistance and electrical strength, grounding contact work;

7, temperature rise, breaking capacity, normal operation, the force required to pull out the plug;

8, flexible cable and its connection, mechanical strength, heat resistance;

9, screws, current-carrying parts and their connections;

10, creepage distance, electrical clearance and the distance through the sealant;

11. Abnormal heat resistance, fire resistance and electric trace resistance of insulating materials;

12. Additional test of rust-proof performance and bolt with insulating sheath.

Handling process of quality inspection report of conversion plug

1. Business consultation: the applicant provides product information, pictures and test requirements to our company ZRLK;;

2. Project quotation: According to the information provided by the applicant, the engineer makes an evaluation, determines the items to be tested, and makes an oral quotation to the applicant;

3. Providing information: After the applicant accepts the oral quotation, the test samples will be submitted to our company;

4. Payment: After receiving the sample, send a written quotation to the applicant, and the applicant will arrange payment according to the written quotation;

5. Sample testing: conduct product testing according to applicable standards or customer requirements;

6. Issue report: After the test is completed, the laboratory issues a test report and closes the case.

image.png

Please contact ZRLK for the quality inspection report of the adapter plug, and we will provide you with professional and efficient testing and certification services with favorable price and thoughtful service. If you provide us with product pictures and specifications, we will give the corresponding cycle, quotation and specific plan according to your products. Welcome to inquire!

Related Articles
  • Can the coding format for the same model of battery be changed? CCC certification application methods!

  • After CCC certification, the problem of marking semi-finished battery cells in battery packs is solved in this way!

  • Frequently Asked questions about battery pack warning instructions: These key points need to be kept in mind

  • Do you know the requirements for key components of the CCC report for lithium-ion batteries?

Follow Us
亚洲av激情无码专区在线播放| 亚洲激情无码视频| 狼人大香伊蕉国产www亚洲| 60分钟高清在线播放器| 一本久道综合在线无码88| 性一交一乱一伦一| www久久只有这里有精品| 中文字幕久久精品无码| 日日碰日日摸日日澡视频播放 | 欧美国产成人精品一区二区三区| 国产69久久精品成人看| 国产成人无码a区在线观看导航| 精品福利一区二区三区免费视频| 国产女人高潮叫床视频| 少妇脱了内裤让我添| 免费a级毛片无码a∨免费软件| 精品国产三级在线观看| 日本老熟妇乱| 久久久亚洲精品成人| 国模吧无码一区二区三区| 亚洲av无码国产一区二区三区| 99精品久久精品一区二区| 国模冰莲自慰肥美胞极品人体图| 精品日韩欧美一区二区在线播放| 人妻精品久久无码专区精东影业| 快好爽射给我视频| 中文在线а天堂| 精品国产一区二区三区香蕉| 亚洲日韩AV成人无码精品| 99热免费在线观看| 老太婆性杂交欧美肥老太| 久久精品a亚洲国产v高清不卡 | 欧美成人影院在线观看| 久久精品人人做人人综合| 开心久久婷婷综合中文字幕| 四虎国产精品永久在线| 日本欧美视频在线观看| 久久久精品国产sm最大网站| 27邪态恶动图gif喷水赞一把| 亚洲日韩中文字幕在线播放| 法国白嫩大屁股xxxx|