Pay attention! The fourth edition standard IEC 62368-1: 2023 for audio/video, information technology and communication technology equipment has been published

Author:中認(rèn)聯(lián)科 time:2023-06-27 Ctr:734

On May 26th, 2023, the International Electrotechnical Commission (IEC) issued the IEC 62368-1:2023 (4th edition) standard. This standard specifies the safety requirements of electrical and electronic equipment (rated voltage not exceeding 600V) using audio, video, information technology and communication technology in the field of business and office machines (excluding the requirements of equipment performance or functional characteristics).

The main technical contents of the new standard and IEC62368-1:2018 (third edition) are changed as follows:

◆ In section 4.1.1, delete "Accepting components and assemblies conforming to IEC 60950-1 or IEC 60065".

It means that the fourth edition no longer accepts components or assemblies certified by IEC 60950-1 and IEC 60065.

◆ Chapter 4.1.8 updated the equipment/components applicable to pressurized LFC test G.15

Delete "G.15 is not applicable to equipment with more than 1L liquid", which means that equipment with more than 1L liquid should also be evaluated.

◆ The test requirements for thermoplastic) T.8 have been added in 4.4.3.1 chapter.

As a safety protection, the untouchable thermoplastic materials also need to do T.8 stress relief test, such as insulating sheets for internal insulation and isolation.

◆ Section 4.8 is added with inapplicable requirements including button cell equipment types and warnings.

The updated section 4.8 is not applicable to the equipment that is unlikely to be taken out by children in button cell, but the relevant battery warning (4.8.2) is required.

◆ Chapter 4.8.3 updated the structural design requirements for button cell protective doors or covers.

Chapter 4.8.3 adds a variety of acceptable structural design types.

◆ Chapter 4.10.3 added the requirements for the main power cord.

It is clear that the power cord only needs to meet the requirements of G.7 power cord, and it is not necessary to use the power cord as an external cord to meet the requirements of Chapter 6, especially the fire protection requirements of the external cord in Chapter 6.5.

◆ 5.5.2.2 chapter has increased the requirements for plug discharge of industrial equipment.

The plug discharge test of industrial equipment with Pluggable equipment type B was added, and the touchable voltage was not measured until 5 seconds later.

◆ 5.6.2.2 chapter updated the color requirements of grounding conductor.

It is clear that the yellow-green color (wire) cannot be used for functional grounding unless it is a multi-purpose preassembled part.

◆ 6.2.3.2 chapter updated the test method of resistive PIS.

The test method of resistive PIS is simplified. When the control fire spread method is used, except for the secondary lithium battery, the parts and conductors in the PS2 circuit are not considered as resistive PIS, and the PS3 circuit is all resistive PIS.

◆ Chapter 6.3.1 updated the parts for which the external material requirements of the fire enclosure are not applicable.

Loudspeaker drivers, mesh cloth, foam, grid covering materials, etc. are added to the parts where the external material requirements of the fire-proof enclosure are not applicable.

At the same time, relevant tests (the requirements are the same as UL60065) for mesh cloth, foam and grid covering materials that need to comply with Appendix S.6 have been added.

◆ Chapter 6.4.6 updated the requirements for controlling the flame spread in the PS3 circuit.

Added that the distance between the varistor and the plastic shell is less than 13mm, and the varistor should meet the requirements of G.8.2, regardless of the fire rating of the shell.

◆ Chapter 6.4.8.3.4 updated the requirements for the opening at the bottom of the fire enclosure.

It is added that flammable materials are unlikely to exist in the surrounding environment of professional equipment (for example, in data centers and server rooms). If the bottom surface of the fire enclosure meets the requirements of 6.4.8.3.4, the Extended bottom surface can be regarded as the applicable opening requirements of the fire enclosure as shown in Figure 44.

防火外殼開孔要求.png 

◆ Chapter 6.4.8.3.5 updated the requirements for the opening on the side of the fire enclosure.

The relationship between the lateral thickness and the opening of the fire-proof enclosure is added, which meets the requirements of the lateral opening as shown in Figure 45.

防火外殼側(cè)面開孔.png 

◆ Chapter P.2.1 has updated the requirements for opening holes on the side of the foreign body proof shell.

The dimension of the newly added opening on the side of the shell to prevent foreign objects from entering meets the requirements as shown in Figure P.3, and the maximum vertical height of the opening on the side is less than 11 times the thickness of the side of the shell.

外殼側(cè)面開孔尺寸.png 

◆ Chapter 9.6 updated the requirements of wireless power transmitter.

It is clear that the test requirements of wireless power transmitter are only applicable to planar transmitter, and if the transmitter is not planar, such as sloping, the test is not applicable.

◆ Chapter 9.6.3 updated the test method and qualification criteria.

Modify the test method: 1). The foreign body should be fixed reliably during the test; 2). The four cycles of testing foreign bodies are done twice respectively. The first time, let the emitter work before releasing foreign bodies, and the second time, let the emitter work before releasing foreign bodies.

The temperature limit value is relaxed.

◆ Section B.2.5 updated the judgment requirements for input test.

The judgment of equipment powered by non-grid power supply has been modified, requiring that the current or power input for testing should not be greater than the rated value of the equipment.

◆ Chapter F.3.5.3 updated the requirements for fuse marking.

It is clear under what circumstances the fuse needs the indicative safety protection and the marking elements of the indicative safety protection.

◆ Chapter F.3.6.2 updated the labeling requirements for Class II equipment with functional grounding.

It is clear which Class II devices with functional grounding need to be marked with functional grounding symbols (IEC 60417-6092).

接地符號.png 

◆ Chapter G.7.3 updated the requirements of non-detachable soft fixation and stress relief.

It is clear that the interconnecting cable of ES2/ES3/PS3 circuit also needs to be tested for flexible cord stress relief.

◆ Chapter G.15 updated the test requirements for LFC.

The requirements of Self-contained LFC and modular LFC have been added to deal with liquid cooling equipment larger than 1 liter.

◆ Chapter M.4 updated the applicable product categories.

Deleting the word "portable device" means that the requirements of M.4 are also applicable to non-portable battery products, and the range of applicable devices is expanded.

There are additional safety protection requirements when standing equipment with lithium battery is added.

◆ Chapter M.4.3 updated the test requirements for battery cell output PS.

It is clear that the PS energy source needs to be evaluated for single cell or combined cell, and the fire-proof enclosure can be exempted only when the output is below PS1.

Warm tips

ZRLK has been focusing on the testing and certification of consumer electronic and electrical products for 18 years, always paying attention to the changes of laws and regulations in various countries, and providing customers with one-stop testing and certification services to ensure that your products enter the target market quickly. Our company has a professional technical team and rich experience in product testing, and can provide you with a test report that meets the requirements. If you need it, please feel free to contact us, and our engineers will serve you at the first time!

Related Articles
  • How do smart desk lamps pass CE certification? ZRLK is your escort

  • Sodium battery UN38.3 certification: a key link to ensure product safety and compliance

  • CCC certification points of large capacity charging box: battery, headphones can not be less

  • CCC certification of the earphone charging case: The rated capacity of the battery cell is less than 600mAh.

Follow Us
在线天堂中文在线资源网| 欧美人与动性XXXXX交性| 色噜噜亚洲精品中文字幕| 青娱乐极品视觉盛宴| 国产古装全黄A级视频| 国产高清中文字幕| 狠狠久久亚洲欧美专区| 国产成人a∨激情视频厨房| 高h禁伦餐桌上的肉伦np| 女高中生自慰免费观看WWW| 国产成人精品高清免费| 亚洲高潮视频| 国产饥渴熟女91专区九色| 亚洲av无码国产精品色| 娇妻被黑人粗大高潮白浆| 久久99青青精品免费观看| 亚洲色精品三区二区一区| 久久久久人妻精品一区蜜桃| 久久精品九九热无码免贵| 国产成人精品高清啪一区| 国产色无码精品免费看| 日本熟妇hdsex视频| 亚洲精品亚洲人成人网| 亚洲av日韩av女同同性| 午夜精品久久久久久久99热| 开心久久婷婷综合中文字幕| 欧美日韩不卡合集视频| 男人扒女人添高潮视频| 精品露脸国产偷人在视频| 极品嫩模高潮叫床| 久久99精品久久久久麻豆 | 亚洲av永久无码精品放毛片| 欧美成人亚洲国产精品| 欧美日产国产精品| 国产男女无遮挡猛进猛出| 国产一区二区高清在线| 精品国产不卡一区二区三区| 我把护士日出了白浆| 国产成人av一区二区三区不卡| 日日狠狠久久8888偷偷色 | 国产免费久久精品99久久|